Optimization Drilling Parameters Performance During Drilling in Gas Wells
International Journal of Oil, Gas and Coal Engineering
Volume 5, Issue 2, March 2017, Pages: 19-26
Received: Nov. 29, 2016; Accepted: Dec. 10, 2016; Published: Mar. 22, 2017
Views 2058      Downloads 109
Author
Mehaysen A. AL-Mahasneh, Chemical Engineering Department, Al-Huson University College, Al-Balq'a Applied University, Irbid, Jordan
Article Tools
Follow on us
Abstract
The objective of the present work is to optimize drilling parameters such as WOB, ROP, RPM, flow rate and drill diameter of hole. The research contribution to investigation and analysis field data. This paper focuses on the optimization of drilling parameters. Drilling optimization is very important during drilling operation, to save time and cost of operation thus increases the profit. The result from analysis is used to determine optimum, RPM, ROP, flow rate, to give optimum drilling performance. Optimization the drilling parameters for depth at 11778.79 ft, weight on bit between 33000 lbs to 44000 lbs and rotary speed range between 50 to 80 rotation per minute, flow rate is 356.67 gallon /min, Optimize value of weight on bit per inch diameter of bit 8 1/2" in range 3882.35 lbs /in to 5176..47 lbs/in, The productive time for drilling is 60.5%. from total time of operations.
Keywords
Drilling, Rate of Penetration, Rotary Speed, Weight on Bit, Optimization, Parameters Drilling, Gas Well
To cite this article
Mehaysen A. AL-Mahasneh, Optimization Drilling Parameters Performance During Drilling in Gas Wells, International Journal of Oil, Gas and Coal Engineering. Vol. 5, No. 2, 2017, pp. 19-26. doi: 10.11648/j.ogce.20170502.12
Copyright
Copyright © 2017 Authors retain the copyright of this article.
This article is an open access article distributed under the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/) which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
References
[1]
Azar J. J., and Samuel G. R., "Drilling Engineering", Penn Well Corporation, Tulsa OK, 2007.
[2]
Society Petroleum Engineering, March 2008, Petroleum Engineering, Drilling Engineering, Drilling Optimization, Practical Guidelines.
[3]
Carden, R. S., Grace, R. D., and, Shursen, J. L.: “Drilling Practices, ” Petroskills-OGCI, Course Notes, Tulsa, OK, 2006, pp 1-8
[4]
Samuel G. R., and Miska S., “Optimization of Drilling Parameters with the Performance of Multilobe Positive Displacement Motor (PDM), ” SPE 47791, IADC/SPE Asia Pacific Drilling Conference, Jakarta, Indonesia, September 1998
[5]
Short J. A., “Introduction to Directional and Horizontal Drilling, ” PennWellPublishing Company, Tulsa, OK, 1993, pp 3
[6]
Bourgoyne A. T. Jr., Millheim K. K., Chenevert M. E., and Young F. S., "Applied Drilling Engineering", Society of Petroleum Engineers Text Book Series, Vol. 1, Richardson, TX, 1986.
[7]
Drilling data management with server-based systems and proprietary software. World Oil, Vol. 229 No. 12, pp 78, December 2008.
[8]
Pickering J. G., Kreijger J., Grovik L. O., Franssens D., and Doniger A., “WITSML “Comes of Age” for the Global Drilling and Completions Industry,” SPE 124347-MS, SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, 4-7 October 2009.
[9]
Lummus J. L., “Drilling Optimization,” SPE 2744, SPE 40th Annual California Fall Meeting, San Francisco. November 1969
[10]
-Final Drilling Report well RH-39, Drilling Rigs (National E-610, Ideco E-1700), Drilling Department August -2006.
[11]
Final Final Drilling Report well RH-40H, Drilling Rigs (National E-610, Ideco E-1700), Drilling Department June -2006.
[12]
Final Final Drilling Report well RH-42S, Drilling Rigs (National E-610, Ideco E-1700), Drilling Department June -2007.
[13]
Ozbayoglu M. E., Miska S. Z., Reed T., and Takach N., “Analysis of the Effects of Major Drilling Parameters on Cuttings Transport Efficiency for High-Angle Wells in Coiled Tubing Drilling Operations, ” SPE 89334, SPE/IcoTA CT Conf. andExhb., Houston, TX, March 2004
[14]
Al-Betairi E. A., Moussa M., and Al-Otaibi S., “Multiple Regression Approach to Optimize Drilling Operations in the Arabian Gulf Area, ” SPE 13694, Middle East Oil Symposium, Bahrain, March 1985
[15]
Dubinsky V. S., and Baecker D. R., “An Interactive Drilling Dynamics Simulator for Drilling Optimization and Training,” SPE 49205, SPE Annual Technical Conference, New Orleans, September 1998.
[16]
Tuna, E., 2010. Real-time-optimization of drilling parameters during drilling operations (Thesis). Middle East Technical University,
[17]
Moses, A. A. and F. Egbon, 2011. Semi-analytical models on the effect of drilling fluid properties on Rate of Penetration (ROP), SPE no. 150806. Proceedings of the Nigeria Annual International Conference and Exhibition, 30 July-3, Abuja, Nigeria
[18]
Sonny Irawan, Adib Mahfuz Abd Rahman and Saleem Qadir Tunio." Optimization of Weight on Bit During Drilling Operation Based on Rate of Penetration Model" Research Journal of Applied Sciences, Engineering and Technology 4 (12): 1690-1695, 2012, ISSN: 2
[19]
Final Drilling Report well RH-3, N. R. A. Petroleum Exploration Directorate, 1988.
[20]
Final Geological Report Well RH—3, N. R. A, Petroleum Exploration Directorate.
ADDRESS
Science Publishing Group
1 Rockefeller Plaza,
10th and 11th Floors,
New York, NY 10020
U.S.A.
Tel: (001)347-983-5186